  "as_of": "2025-12",
  "name": "Cross-regional and cross-provincial power flows (West-to-East Power Transmission)",
  "source": "National Energy Administration (NEA), China Electricity Council (CEC), SASAC, People's Daily/Xinhua — via the \"Seeing China Through the Energy Transition\" series, a CCTV report on 14th Five-Year Plan UHV construction, and the CEC \"China Electric Power Industry Annual Development Report 2026\"",
  "sources": [
    "West-to-East Power Transmission cumulative 2013-2023 >9 trillion kWh (>9,000 TWh) (People's Daily/NEA 2024-10)",
    "End-14th Five-Year Plan West-to-East transmission capacity 340 GW (up from 270 GW at end of the 13th Five-Year Plan, +~26%) (CCTV/NEA)",
    "2024 cross-region UHV-DC clean energy delivered ~420 TWh, +70% vs end of the 13th Five-Year Plan, ~60% of UHV-DC outflow (CCTV/NEA)",
    "46 UHV AC/DC projects operating end-2025 (22 AC + 24 DC), +9.5% y/y (Zhiyan Consulting/industry stats)",
    "15th Five-Year Plan State Grid (SGCC) fixed-asset capex ¥4 trillion, +40% vs 14th Five-Year Plan (~¥800 billion/yr) (NEA/SASAC/People's Daily 2026-01-15)",
    "15th Five-Year Plan cross-region transfer capacity to rise more than 30% from the end-14th Five-Year Plan level (NEA 2026-01)",
    "15th Five-Year Plan: 15 new UHV DC lines into operation, West-to-East Power Transmission scale above 420 GW, 6+ regional grid mutual-support interconnection projects (~40 GW), national grid fixed-asset investment ¥5 trillion+ (+80% vs 14th Five-Year Plan) (CEC \"China Electric Power Industry Annual Development Report 2026\" 2026-07-17)",
    "2025 grid capex ¥639.5 billion +5.1%, UHV-DC work +25.7% (CEC 2026-02)",
    "2025 closeout: four UHV DC lines (Longdong-Shandong, Ningxia-Hunan, Hami-Chongqing, Upper Jinsha-Hubei) + Qinghai-Tibet grid interconnection phase II (NEA 2025-12-22)",
    "2026 first: Northern Shaanxi-Anhui ±800 kV DC in operation 2026-06-30 (1,055 km, ¥20.5 billion); Gansu-Zhejiang, the world's first flexible UHV DC line (~2026-27, 2,370 km, 36 TWh/yr, >50% green power) (CCTV/powerchina/tyrb)",
    "15th Five-Year Plan export corridors connect Gobi anchor deserts to load centers (dfcfw 2026 grid strategy)"
  ],
  "summary": {
    "note": "National west-to-east power transmission scale. Cumulative and capacity figures are exact where a source stated them; annual flows are directional.",
    "west_east_cumulative_twh": {
      "note": "Cumulative electricity delivered over West-to-East Power Transmission corridors. Reported 2013-2023: >9 trillion kWh (>9,000 TWh); southern network cumulative ~3.3 trillion kWh (~3,300 TWh) by 2024-07.",
      "since_2013_2023_twh": 90000,
      "since_2013_2023_exact": false,
      "southern_cumulative_twh": 33000,
      "southern_cumulative_exact": false,
      "units": "Shown in TWh (1 trillion kWh = 1,000 TWh). Raw values in this dataset are in units of 100 million kWh (0.1 TWh)."
    },
    "transmission_capacity_gw": {
      "note": "West-to-East Power Transmission capacity (all corridors), GW.",
      "end_h14_gw": 270,
      "end_15_5_gw": 340,
      "note_delta": "~+26% over the 14th Five-Year Plan",
      "report_year": 2025
    },
    "uhvdc_clean_energy_2024_twh": {
      "note": "Cross-region UHV-DC clean electricity delivered in 2024 (raw value in 100 million kWh).",
      "twh": 4200,
      "exact": false,
      "pct_of_uhvdc_outflow": "~60%",
      "pct_growth_vs_h14_end": "+70%"
    },
    "uhv_network_end_2025": {
      "note": "UHV AC/DC projects operating at end-2025 (industry stats).",
      "total": 46,
      "ac": 22,
      "dc": 24,
      "pct_growth_yoy": "+9.5%"
    },
    "uhvdc_line_km": {
      "h14_end": 28000,
      "h15_5": 40000
    },
    "plan_15_5": {
      "note": "15th Five-Year Plan (2026-2030) forward plan: capex, transfer network and new-build pipeline. Capex raw values are in 100 million yuan.",
      "sgcc_capex_bn_rmb": 40000,
      "sgcc_growth_pct_vs_h14": "+40%",
      "sgcc_annual_bn_rmb": 8000,
      "national_capex_bn_rmb": 50000,
      "national_growth_pct_vs_h14": "+80%",
      "transfer_capacity_delta": ">30% higher",
      "new_uhvdc_lines": 15,
      "west_east_capacity_gw": 420,
      "west_east_capacity_exact": false,
      "regional_interconnect_projects": 6,
      "regional_interconnect_gw": 40,
      "new_install_gw_per_yr": 200,
      "non_fossil_consumption_pct": 25
    },
    "projects_2025": [
      {
        "name": "Longdong-Shandong ±800 kV UHV DC",
        "name_cn": "陇东-山东",
        "status": "commissioned 2025, closing out the 14th Five-Year Plan",
        "capacity_mw": 8000,
        "distance_km": 915,
        "investment_bn_rmb": 20.2,
        "note": "Eastern Gansu (Longdong) to Shandong. China's first export line from a large integrated wind-solar-thermal-storage energy base; the first UHV DC line to enter service at full capacity in a single step; 14.5 GW of paired generation (incl. 10.5 GW wind and solar + 1.05 GW storage); sends 36 TWh a year to Shandong, cutting CO2 by 16 million tonnes and raising Shandong's power-import capacity to 38 GW."
      },
      {
        "name": "Ningxia-Hunan ±800 kV UHV DC",
        "name_cn": "宁夏-湖南",
        "status": "commissioned 2025",
        "capacity_mw": 8000,
        "distance_km": null,
        "investment_bn_rmb": null,
        "note": "UHV DC line commissioned in 2025, the final year of the 14th Five-Year Plan (NEA 2025 year-end closeout list)."
      },
      {
        "name": "Hami-Chongqing ±800 kV UHV DC",
        "name_cn": "哈密-重庆",
        "status": "commissioned 2025",
        "capacity_mw": 8000,
        "distance_km": null,
        "investment_bn_rmb": null,
        "note": "Xinjiang → Chongqing; commissioned in 2025, the final year of the 14th Five-Year Plan (NEA 2025 year-end closeout list)."
      },
      {
        "name": "Upper Jinsha-Hubei ±800 kV UHV DC",
        "name_cn": "金上-湖北",
        "status": "commissioned 2025-12-18",
        "capacity_mw": 8000,
        "distance_km": 1900,
        "investment_bn_rmb": null,
        "note": "From the upper Jinsha River (Jinshang) hydro base. The first UHV DC line reaching into the heart of the Sichuan-Tibet plateau; the first high-altitude project with split-site cascaded converter stations; the world's highest-altitude UHV DC line; Hubei's second corridor for importing power from outside the province, after Northern Shaanxi-Hubei (NEA 2025-12-22)."
      }
    ],
    "projects_2026": [
      {
        "name": "Northern Shaanxi-Anhui ±800 kV UHV DC",
        "name_cn": "陕北-安徽",
        "status": "commissioned 2026-06-30",
        "capacity_mw": 8000,
        "distance_km": 1055,
        "investment_bn_rmb": 20.5,
        "note": "The first UHV DC line commissioned in the 15th Five-Year Plan period, crossing three provinces: Shaanxi, Henan and Anhui (tyrb 2026-07)."
      },
      {
        "name": "Gansu-Zhejiang ±800 kV UHV DC",
        "name_cn": "甘浙直流",
        "status": "commissioning ~2026-27 (world's first flexible UHV-DC)",
        "capacity_mw": 8000,
        "distance_km": 2370,
        "investment_bn_rmb": null,
        "note": "The world's first flexible (voltage-source converter) UHV DC transmission project; flexible converter valves at both ends, split one-quarter each among C-EPRI Electric Power Engineering, NR Electric, XJ Electric and China XD Electric; once complete it will send over 36 TWh a year to Zhejiang with a green-power share above 50%, serving exports from the desert mega-bases (CCTV/powerchina)."
      }
    ],
    "planned_corridors": {
      "note": "15th Five-Year Plan export corridors — each Gobi / desert anchor base maps to an eastern/southern load sink.",
      "list": [
        "Kubuqi → Shanghai (hybrid DC)",
        "Ulan Buh → Beijing-Tianjin-Hebei",
        "Badain Jaran → Sichuan",
        "Tengger → Jiangxi",
        "Qinghai → Guangxi (hybrid DC)",
        "Qinghai → Jiangsu",
        "Southern Xinjiang → Sichuan (fully flexible DC)",
        "Songliao (Northeast) → North China (fully flexible DC)",
        "Inner Mongolia → Jiangsu / East China",
        "Gansu → Shanghai, Gansu → Guangxi, Medog (Tibet) hydropower export"
      ]
    }
  },
  "highlights": [
    "The west-east buildout is enormous and still accelerating: West-to-East Power Transmission capacity rose from 270 GW at the end of the 13th Five-Year Plan (2020) to ~340 GW by the end of the 14th (2025) — 26% more long-distance corridor in five years.",
    "Clean energy is increasingly the cargo: in 2024 cross-region UHV-DC shipped ~420 TWh of low-carbon power, ~60% of all UHV-DC outflow and +70% vs the end of the 13th Five-Year Plan (2020).",
    "The 15th Five-Year Plan doubles down: State Grid will invest ¥4 trillion (+40%), pushing cross-region transfer capacity more than 30% higher with 15 new UHV-DC lines — West-to-East Power Transmission capacity heading past 420 GW (CEC).",
    "The 14th Five-Year Plan closed with four UHV-DC lines commissioned in 2025 (Longdong-Shandong, Ningxia-Hunan, Hami-Chongqing, Upper Jinsha-Hubei) + phase II of the Qinghai-Tibet grid interconnection; Northern Shaanxi-Anhui was the 15th Plan's first, live 2026-06.",
    "Each Gobi anchor desert now has a named transmission corridor — Kubuqi→Shanghai, Ulan Buh→Beijing-Tianjin-Hebei, Badain Jaran→Sichuan, Tengger→Jiangxi — tying /gobi's buildout to specific eastern load sinks.",
    "World's first flexible UHV-DC — Gansu-Zhejiang — targets ~2026-27, 2,370 km, sending >36 TWh/yr at >50% green share."
  ],
  "caveats": [
    "Cumulative West-to-East Power Transmission figures include hydro-dominated southern + northern coal/renewable corridors; annual split not itemized in this source set.",
    "340 GW / 270 GW are transmission capacity (nameplate corridor), not throughput — realized flows are lower and vary by season.",
    "15th Five-Year Plan project names/allocations are planned and subject to revision; treated as pipeline, not committed capacity.",
    "Figures span 2023-2026 releases; treat as scale evidence, not a synchronized single-year ledger.",
    "UHV network count (46) is Zhiyan Consulting citing 2025 industry stats; the GEM line-level table on /transmission carries 45 operating rows (different counting granularity — line vs project)."
  ],
  "generated_at": "2026-10-14T10:17:16"
}