{
  "schema": "chinaqueue-evidence/v1",
  "sources": [
    {
      "id": "gem-map-sep-2026",
      "title": "Global Integrated Power Tracker — 2026-09 map data",
      "publisher": "Global Energy Monitor",
      "url": "https://globalenergymonitor.org/projects/global-integrated-power-tracker/",
      "effective_date": "2026-09",
      "checked_at": "2026-10-23",
      "note": "Start year is preserved as a source-reported year. It is not confirmation that an active unit will enter commercial operation in that year."
    },
    {
      "id": "nea-2025-year-end",
      "title": "2025 national electricity statistics",
      "publisher": "National Energy Administration, reproduced by National Nuclear Safety Administration",
      "url": "https://nnsa.mee.gov.cn/ywdt/hyzx/202601/t20260129_1142949.html",
      "published_at": "2026-01-29",
      "effective_date": "2025-12-31",
      "checked_at": "2026-10-23",
      "note": "Wind 640 GW and solar 1,200 GW at end-2025, using the rounded national figures."
    },
    {
      "id": "nea-2026-july",
      "title": "January–July 2026 national electricity statistics",
      "publisher": "National Energy Administration",
      "url": "https://www.nea.gov.cn/20260825/1430d07985474c5b8110552785f1c74b/c.html",
      "published_at": "2026-08-25",
      "effective_date": "2026-07-31",
      "checked_at": "2026-10-23",
      "note": "Wind 690 GW and solar 1,290 GW at end-July 2026. These rounded official stocks support the stated Jan–Jul pace arithmetic."
    },
    {
      "id": "ndrc-2030-renewables",
      "title": "15th Five-Year Renewable Energy Plan — official explanation",
      "publisher": "NDRC and National Energy Administration",
      "url": "https://www.ndrc.gov.cn/xxgk/jd/jd/202607/t20260723_1406645_ext.html",
      "published_at": "2026-07-23",
      "effective_date": "2030-12-31",
      "checked_at": "2026-10-23",
      "note": "Target: wind and solar installed capacity at least 2,800 GW by 2030. This supersedes using the already-achieved 1,200 GW benchmark as a future stretch target."
    },
    {
      "id": "nea-gansu-zhejiang-2026",
      "title": "Gansu regulator reports progress on Gansu–Zhejiang transmission and associated generation",
      "publisher": "National Energy Administration, Gansu office",
      "url": "https://gsb.nea.gov.cn/dtyw/jgdt/202606/t20260609_302743.html",
      "published_at": "2026-06-09",
      "effective_date": "2026-06-09",
      "checked_at": "2026-10-23",
      "note": "The regulator describes staged entry into service by June 2027 for the DC project and associated generation. The source names Jinchang and Wuwei coal units and the Jiuduntan solar project, but is not a unit-by-unit commercial-operation schedule."
    },
    {
      "id": "gem-uhv-2026-08",
      "title": "Ultra-High-Voltage transmission system in China — site snapshot",
      "publisher": "Global Energy Monitor",
      "url": "https://www.gem.wiki/Ultra-High-Voltage_(UHV)_Power_Transmission_System_in_China",
      "effective_date": "2026-08-07",
      "checked_at": "2026-10-23",
      "note": "Existing curated corridor inventory; rated GW is not measured electricity flow. Later dated notes are shown separately."
    },
    {
      "id": "xinhua-shaanxi-anhui-2026",
      "title": "State Grid announces Shaanbei–Anhui UHVDC entered operation",
      "publisher": "Xinhua, reporting State Grid announcement",
      "url": "https://www.news.cn/20260630/27d55c87434d4827b8a5546088efb371/c.html",
      "published_at": "2026-06-30",
      "effective_date": "2026-06-30",
      "checked_at": "2026-10-23",
      "note": "Explicit dated operation announcement supersedes the older construction status in the curated GEM UHV inventory. Rated capacity 8 GW."
    }
  ],
  "targets": [
    {
      "id": "wind-solar-2030",
      "name": "Wind + solar installed capacity",
      "metric": "installed_capacity",
      "unit": "GW",
      "geography": "China",
      "technologies": [
        "Wind",
        "Solar"
      ],
      "year": 2030,
      "value": 2800,
      "comparator": "at least",
      "source_id": "ndrc-2030-renewables",
      "policy_status": "current verified target"
    }
  ],
  "observations": [
    {
      "date": "2025-12-31",
      "wind_gw": 640,
      "solar_gw": 1200,
      "source_id": "nea-2025-year-end"
    },
    {
      "date": "2026-07-31",
      "wind_gw": 690,
      "solar_gw": 1290,
      "source_id": "nea-2026-july"
    }
  ],
  "corridor_claims": [
    {
      "corridor": "Gansu-Zhejiang",
      "event": "staged entry into service",
      "latest_date": "2027-06-30",
      "earliest_year": null,
      "latest_year": 2027,
      "precision": "by month",
      "label": "By Jun 2027 (staged)",
      "basis": "reported program milestone",
      "source_id": "nea-gansu-zhejiang-2026",
      "note": "Applies to the corridor and associated program as described by the regulator, not every generator in Gansu."
    }
  ],
  "estimate_policy": {
    "probabilistic_forecast": "not published",
    "reason": "The available snapshots and observations do not provide a calibrated, out-of-time unit completion model. Stage shares are not completion probabilities.",
    "allowed": "Reported start-year schedules; explicitly chosen delay scenarios; annualized official-stock pace continuation.",
    "forbidden": "Default dates for undated projects; implicit confidence bands; adding GEM gross pipeline to official installed stock without reconciliation."
  },
  "corridor_status_corrections": [
    {
      "corridor": "Shaanxi-Anhui",
      "status": "operating",
      "effective_date": "2026-06-30",
      "source_id": "xinhua-shaanxi-anhui-2026",
      "note": "Operating since June 30, 2026, per Xinhua reporting State Grid’s same-day announcement. This explicit operating announcement supersedes the construction status in the older GEM inventory; the original status is retained for audit."
    }
  ],
  "reconciliation_policy": "When newer, stronger evidence clearly resolves a discrepancy for the same asset and metric, use it in the displayed state and retain a source-backed annotation explaining the correction. Flag only discrepancies that remain unresolved.",
  "capture": {
    "china_rows": 40024,
    "content_sha256": "19018cdc52b3e7f61b563c3c91aec664a7eacbf18d738e867bbcba7d4b4418c0",
    "discovery_url": "https://globalenergymonitor.github.io/interim-maps/trackers/integrated-power/config.js",
    "file": "gem-map-19018cdc52b3e7f6.json.gz",
    "global_rows": 183404,
    "http_etag": "W/\"b95b9e3132b756d64ab009545dbb036e\"",
    "http_last_modified": "Thu, 24 Sep 2026 11:20:47 GMT",
    "license_note": "GEM public tracker data; preserve GEM attribution and source-specific terms.",
    "publisher": "Global Energy Monitor",
    "release": "2026-09",
    "retrieved_at": "2026-10-23T00:00:57.868314Z",
    "schema": "chinaqueue-source/v1",
    "scope": "country-area1=China AND all-countries=China; cross-border records excluded",
    "selected_sha256": "f17a4ab84b105f191e28e33de8a4b4231fdf307c3b29a4854d6bb58c15fab7bb",
    "snapshot_id": "gem-map-19018cdc52b3e7f6",
    "source_bytes": 62090346,
    "source_page": "https://globalenergymonitor.org/projects/global-integrated-power-tracker/",
    "source_url": "https://publicgemdata.nyc3.cdn.digitaloceanspaces.com/Current_maps/integrated-power/2026-09/integrated_map_2026-09.csv",
    "verification": "complete CSV parsed; required schema and minimum coverage passed"
  }
}
