{
  "schema": "chinaqueue-trajectory/v1",
  "metric": "China wind + solar installed capacity",
  "unit": "GW",
  "observations": [
    {
      "date": "2025-12-31",
      "gw": 1840,
      "source_id": "nea-2025-year-end"
    },
    {
      "date": "2026-07-31",
      "gw": 1980,
      "source_id": "nea-2026-july"
    }
  ],
  "target": {
    "id": "wind-solar-2030",
    "name": "Wind + solar installed capacity",
    "metric": "installed_capacity",
    "unit": "GW",
    "geography": "China",
    "technologies": [
      "Wind",
      "Solar"
    ],
    "year": 2030,
    "value": 2800,
    "comparator": "at least",
    "source_id": "ndrc-2030-renewables",
    "policy_status": "current verified target"
  },
  "latest_gw": 1980,
  "remaining_months": 53,
  "gap_gw": 820,
  "target_status": "not yet achieved",
  "required_annual_gw": 185.66037735849056,
  "pace": {
    "start": "2025-12-31",
    "end": "2026-07-31",
    "months": 7,
    "change_gw": 140,
    "annual_gw": 240.0
  },
  "scenarios": [
    {
      "multiplier": 0.5,
      "endpoint_gw": 2510.0
    },
    {
      "multiplier": 1,
      "endpoint_gw": 3040.0
    },
    {
      "multiplier": 1.5,
      "endpoint_gw": 3570.0
    }
  ],
  "sources": [
    {
      "id": "gem-map-sep-2026",
      "title": "Global Integrated Power Tracker — September 2026 map data",
      "publisher": "Global Energy Monitor",
      "url": "https://globalenergymonitor.org/projects/global-integrated-power-tracker/",
      "effective_date": "2026-09",
      "checked_at": "2026-10-23",
      "note": "Start year is preserved as a source-reported year. It is not confirmation that an active unit will enter commercial operation in that year."
    },
    {
      "id": "nea-2025-year-end",
      "title": "2025 national electricity statistics",
      "publisher": "National Energy Administration, reproduced by National Nuclear Safety Administration",
      "url": "https://nnsa.mee.gov.cn/ywdt/hyzx/202601/t20260129_1142949.html",
      "published_at": "2026-01-29",
      "effective_date": "2025-12-31",
      "checked_at": "2026-10-23",
      "note": "Wind 640 GW and solar 1,200 GW at end-2025, using the rounded national figures."
    },
    {
      "id": "nea-2026-july",
      "title": "January–July 2026 national electricity statistics",
      "publisher": "National Energy Administration",
      "url": "https://www.nea.gov.cn/20260825/1430d07985474c5b8110552785f1c74b/c.html",
      "published_at": "2026-08-25",
      "effective_date": "2026-07-31",
      "checked_at": "2026-10-23",
      "note": "Wind 690 GW and solar 1,290 GW at end-July 2026. These rounded official stocks support the stated Jan–Jul pace arithmetic."
    },
    {
      "id": "ndrc-2030-renewables",
      "title": "15th Five-Year Renewable Energy Plan — official explanation",
      "publisher": "NDRC and National Energy Administration",
      "url": "https://www.ndrc.gov.cn/xxgk/jd/jd/202607/t20260723_1406645_ext.html",
      "published_at": "2026-07-23",
      "effective_date": "2030-12-31",
      "checked_at": "2026-10-23",
      "note": "Target: wind and solar installed capacity at least 2,800 GW by 2030. This supersedes using the already-achieved 1,200 GW benchmark as a future stretch target."
    },
    {
      "id": "nea-gansu-zhejiang-2026",
      "title": "Gansu regulator reports progress on Gansu–Zhejiang transmission and associated generation",
      "publisher": "National Energy Administration, Gansu office",
      "url": "https://gsb.nea.gov.cn/dtyw/jgdt/202606/t20260609_302743.html",
      "published_at": "2026-06-09",
      "effective_date": "2026-06-09",
      "checked_at": "2026-10-23",
      "note": "The regulator describes staged entry into service by June 2027 for the DC project and associated generation. The source names Jinchang and Wuwei coal units and the Jiuduntan solar project, but is not a unit-by-unit commercial-operation schedule."
    },
    {
      "id": "gem-uhv-2026-08",
      "title": "Ultra-High-Voltage transmission system in China — site snapshot",
      "publisher": "Global Energy Monitor",
      "url": "https://www.gem.wiki/Ultra-High-Voltage_(UHV)_Power_Transmission_System_in_China",
      "effective_date": "2026-08-07",
      "checked_at": "2026-10-23",
      "note": "Existing curated corridor inventory; rated GW is not measured electricity flow. Later dated notes are shown separately."
    },
    {
      "id": "xinhua-shaanxi-anhui-2026",
      "title": "State Grid announces Shaanbei–Anhui UHVDC entered operation",
      "publisher": "Xinhua, reporting State Grid announcement",
      "url": "https://www.news.cn/20260630/27d55c87434d4827b8a5546088efb371/c.html",
      "published_at": "2026-06-30",
      "effective_date": "2026-06-30",
      "checked_at": "2026-10-23",
      "note": "Explicit dated operation announcement supersedes the older construction status in the curated GEM UHV inventory. Rated capacity 8 GW."
    }
  ],
  "note": "Rounded official stock change annualized over the stated observation interval. Constant-pace continuations are chosen scenarios, not probabilities or calibrated forecasts."
}
