# China Queue Outlook

`/outlook` shows source-reported schedules and explicitly chosen scenarios. It does not publish completion probabilities, a P50 forecast, or confidence intervals. Comparable historical outcome snapshots are not yet sufficient for out-of-time calibration.

## Project evidence

The current input is the public CSV linked from GEM's Integrated Power Tracker map configuration. Capture verifies the publisher URL, full transfer length when supplied, CSV schema, MW units and coverage. Raw China rows and content hashes are immutable under `data/outlook/raw/`; normalized native unit IDs and full source fields are preserved under `data/outlook/snapshots/`. The original ArcGIS capture is retained as a named legacy baseline.

Active means announced, pre-construction or construction. The explorer's default is generation; pumped storage has a separate selector. Reported years before the source year, missing/interval dates, and dates after the displayed horizon stay outside the dated chart. One- and two-year scenarios shift only current/future point years. Units and phases are ranked by capacity without adding parent plant totals. Project source pages and exact raw year strings are available in disclosures.

The initial change ledger is a **source migration**. It does not establish newly announced projects, cancellations or real-world event dates. Native IDs match consecutive current-source snapshots; the legacy fallback requires a unique plant-and-unit-name pair on both sides. Ambiguous identities are excluded. Re-running the same capture preserves the prior comparison; a new capture advances `previous` once and retains history.

## Geographic exploration and province comparison

The interactive atlas moves from national clusters to provinces and individual native units. Search, results and the displayed total share one named cohort. Project records retain source coordinates and precision, reported versus scenario years, native identities and cited regional context. A selected record outside the filters remains inspectable with an explicit explanation; it is not silently added to the total.

The **Compare** section uses two provinces, the wind-or-solar union, one selected stage and a reported-year cutoff. Its controls are independent of the explorer so timing filters cannot remove the records needed for the denominator. Timing groups are mutually exclusive: before the reference year, reference year through cutoff inclusive, after cutoff, and no reported year. Undated unit share and undated capacity share are shown separately. Coordinate labels distinguish exact, approximate, unspecified and no usable coordinates; they are not readiness scores.

Select a comparison number to inspect its contributing native units. Download the attached JSON evidence to preserve the rows, source snapshot/hash, filters, exact totals, definitions and limitations. The same file can be inspected and copied in the page if a download is interrupted. A site link may resolve against a later source update; the saved rows preserve that edition. No plant-program aggregation or completion probability is inferred.

## Infrastructure and source reconciliation

Generation nameplate GW, pumped-storage power GW and transmission rated GW appear in separate lanes and are never summed. Region membership is context, not a claimed unit-to-corridor dependency. Missing dates stay missing; planning windows and latest-by-month milestones retain their precision.

Use the strongest current evidence when it clearly resolves a discrepancy for the same asset and metric. Apply that conclusion to the displayed state and annotate the source, date and reason; retain the superseded value in provenance. Recency alone does not reconcile different definitions. Typed corrections live in `data/outlook/evidence/registry.json` and feed both the Outlook and shared map/UHV outputs. Shaanxi–Anhui is operating from June 30, 2026 based on Xinhua reporting State Grid's announcement. Gansu–Zhejiang uses the regulator's staged-by-June-2027 program milestone rather than the older broad planning window.

## National scenarios

Official wind+solar installed stocks are separate from GEM's gross pipeline. The first release uses rounded NEA stocks of 1,840 GW at end-2025 and 1,980 GW at end-July 2026; the 140 GW change over seven months annualizes to 240 GW/year. The NDRC/NEA 2030 target is at least 2,800 GW. The 820 GW gap over 53 months requires 185.66 GW/year. Constant 50%, 100% and 150% continuations reach 2,510, 3,040 and 3,570 GW respectively. The slider extends from0% to200%. The shaded range represents chosen assumptions, not statistical uncertainty. No seasonality or policy response is modeled.